Survey Work on Bridge Road

Residents are advised that there is survey work being completed on the lower section of Bridge Road October 29-31, 2019.  Any questions can be directed to Brian Winter, Director of Planning and Development, at bwinter@torbay.ca or 727-0531.

Share This On

Leave a Reply